If you need to know about batteries; you’ve come to the right place Chinese flag 点击这里访问我们的中文网站 Chinese flag

AEG reveals lead-acid ESS project in Spain

Fri, 01/09/2015 - 09:34 -- Laura Varriale
AEG lead-acid ESS

Electronic systems provider AEG (AEG) working alongside Spanish utility Iberdrola and European research foundation Tecnalia, has delivered a lead-acid battery energy storage system (ESS) located at Iberdrola’s substation in Vitoria, Spain.

The grid-connected system designed for peak shaving times. The ESS is designed to have an energy capacity of 0.6MWh and allow the utility to monitor the grid load as well as to integrate the locally generated wind power.

The full story is only available in our FREE weekly industry newsletter, so sign-up to get it delivered to your inbox every Monday.