If you need to know about batteries; you’ve come to the right place Chinese flag 点击这里访问我们的中文网站 Chinese flag

320kW

Fourth MW hybrid flywheel ESS unveiled

Thu, 06/04/2015 - 10:44 -- Paul Crompton
Fourth MW hybrid flywheel ESS unveiled

A flooded lead-acid battery will be part of flywheel manufacturer Beacon Power’s latest 320kW hybrid energy storage project in Alaska.

The battery in the existing utility owned system is being used to help prove out the control system and application concepts of the Energy Storage System (ESS) in Anchorage.

The full story is only available in our FREE weekly industry newsletter, so sign-up to get it delivered to your inbox every Monday.
Subscribe to 320kW