APR Energy’s contract to supply 200 MW diesel power to Libya has been extended under its original terms as part of a 450 MW project providing temporary power.
In June 2013 250 MW gas turbine power was added to the original supply deal. The combined 450 MW diesel and gas turbine power provision in Libya is APR’s single largest deal ever.
The combined gas and diesel-generators provide interim power to the population of Libya as infrastructure is being repaired and rebuilt across the country.