China’s Gotion High-Tech has secured 6GWh of battery storage capacity in Saudi Arabia’s first utility-scale battery storage programme, accounting for around 75% of the total tender.
Saudi Power Procurement Company (SPPC) awarded the company three core sites of Al Muwayah, Haden and Al Kahafa, under the G1 project. Each site will provide 500MW/2GWh, giving the project a combined capacity of 2GW/8GWh and a value of around $1.16 billion.
The award represents the first international large-scale deployment of Gotion Grid, the company’s utility-scale energy storage system. Gotion says the system has been engineered for extreme environmental conditions, with an operating range from -30°C to 55°C.
Its thermal management system is designed for desert conditions and maintains full output during sandstorms, while reducing high-temperature degradation by 40% compared with conventional systems.
The ESS has a stated design life of 25 years, compared with an industry average of 15–20 years. The company says this can avoid mid-life equipment replacement, an important consideration for build-own-operate contracts requiring more than 20 years of operation.
The system also incorporates an AI-powered battery management system for intelligent dispatch, proactive safety warnings and lifecycle diagnostics. All three Gotion sites can be remotely operated and connected to Saudi Arabia’s 380kV backbone grid.
The award adds to the company’s growing presence across the Middle East and North Africa, where it says its regional footprint is around 9GWh. This includes a 1.5GWh BESS in Egypt alongside a planned 3GWh local manufacturing base, and a 1.2GWh project in Morocco with ACWA Power.
Globally, the company’s cumulative system-level storage projects exceed 10 GWh, including a 281MW/843MWh solar-storage project under construction in Australia that is expected to enter commercial operation in the first half of 2027.
With G1 awarded and G2 underway, the Saudi programme could provide further opportunities as renewable deployment and grid stability requirements increase.
Image: Gotion BESS. Credit: Gotion


