If you need to know about batteries; you’ve come to the right place
Chinese flag点击这里访问我们的中文网站Chinese flag

APR Energy commissions 200 MW gas turbine power project in Uruguay

Tue, 06/11/2013 - 18:36 -- Editor

Temporary power provider APR Energy has commissioned a 200 MW gas turbine power project in Uruguay.

The project is divided across two sites in La Tablada and Punta del Tigre. The full turnkey 150kV, 100 MW solution at Punta del Tigre went into operation in May, bringing APR Energy's total capacity at the site to 200 MW.

The 100 MW plant at La Tablada, which became operational in April, includes 150kV substation equipment for protection and metering.

In total, eight mobile gas turbines have been deployed for the 200 MW project.