LG Energy Solution showcased its battery technologies for artificial intelligence data centres (AIDCs) at Data Centre World Asia 2026, held at Marina Bay Sands in Singapore on 29–30 September.
Working alongside LG Electronics and LG CNS, the company presented the One LG AI Factory, an integrated approach combining power infrastructure, cooling, construction and operational expertise to support next-generation data centres.
Under the theme “End-to-End AI Factory Infrastructure Partner,” the joint exhibition demonstrated solutions spanning the AIDC lifecycle, including battery backup units (BBUs), uninterruptible power supply (UPS) batteries and battery energy storage systems (BESS).
Battery solutions for growing AI power demands
As AI workloads increase and computing facilities expand, reliable power infrastructure is becoming increasingly important. Battery technologies can provide immediate backup power at server level while supporting energy management across facilities and the electricity grid.
For server racks, LG Energy Solution displayed its 2170 cylindrical battery for BBUs, designed to supply direct current (DC) power during unexpected interruptions.
At facility level, the company presented its JP5 backup power system, which delivers megawatt-class power within a footprint of 1m². Its self-powered switched-mode power supply enables the battery management system and battery protection unit to operate without an external power source. The JP5 also incorporates UL9540A certification.
For grid-scale applications, the JF2 DC Link uses lithium iron phosphate (LFP) technology to provide 5.0MWh-class energy storage in a single 22.1ft container. Liquid cooling, thermal management and UL9540A safety certification are among its features. Its state-of-charge calibration-free technology is designed to maintain accurate charge monitoring without separate calibration, thus supporting more efficient management of large-scale energy storage systems..
LG Energy Solution also highlighted its JF2 AC Link, aimed primarily at North American utility customers and meeting NVIDIA DSX Ready requirements.
Integrated infrastructure for AI factories
The One LG AI Factory concept combines LG Energy Solution’s battery technologies with LG Electronics’ cooling systems and LG CNS’s data centre construction and operational capabilities.
Through its BBU, UPS battery and BESS portfolio, LG Energy Solution aims to address power continuity and energy management requirements as AI infrastructure becomes larger and more complex.
Image credit: LG Energy Solution.


