If you need to know about batteries; you’ve come to the right place Chinese flag 点击这里访问我们的中文网站 Chinese flag

MiRIS

CMI Energy launches mixed-tech BESS pilot in Belgium

Mon, 11/05/2018 - 00:00 -- Hugh Finzel
CMI pilot project

Belgium-based engineering group CMI Energy has launched a full-scale pilot project that integrates solar with battery energy storage at the firm’s headquarters in Seraing.

The Micro Réseau Intégré Seraing (MiRIS) energy storage pilot plant comprises a 2MWp (megawatt peak— indicating the maximum output of a plant) 1.75 gigawatt-hours per year (GWh/yr) solar PV system, with 6,500 rooftop and carport panels. The 4.2 megawatt-hour energy storage system consists of a lithium-ion system and “two separate flow battery systems”.

The full story is only available in our FREE weekly industry newsletter, so sign-up to get it delivered to your inbox every Monday.
Subscribe to MiRIS